Electrical checklists from the US Army

These are the so-called DA Forms from "Commissioning of Electrical Systems for Command, Control, Communications, Computer, Intelligence, Surveillance, and Reconnaissance (C4ISR) Facilities" the US Army.

The forms are no lonfer available from the original website.

Click on each of the forms to enlarge.

Circuit switcher inspection checklist.Transformer inspection checklist.
Switchgear inspection checklist.
Power cable inspection checklist.
Main power energization checklist.
Engine generator inspection checklist.
Utility and generator circuit breaker inspection checklist.
Backup power system inspection checklist.
Transfer switch inspection checklist.
UPS inspection checklist.
Battery inspection checklist.
UPS switchboard inspection checklist.
UPS systems inspection checklist.