- Mechanical: Airflow Management — The efficiency and effectiveness of a datacenter conditioning system is heavily influenced by the path, temperature and quantity of cooling air delivered to the IT equipment and waste hot air removed from the equipment.
- Eliminate mixing and recirculation of hot equipment exhaust air
- Hot aisle/Cold aisle.
- Rigid enclosures
- Flexible strip curtains
- Blank unused rack positions
- Design for IT airflow configuration
- Select racks with good internal airflow
- Maximize return air temperature by supplying air directly to the loads
- Use appropriate diffusers
- Position supply and returns to minimize mixing and short circuiting
- Minimize air Leaks in raised floor systems
- Optimize location of computer room air conditioners
- Provide adequately sized return plenum or ceiling height
- Provide adequately sized supply
- Use an appropriate pressure in underfloor supply plenums
- Eliminate mixing and recirculation of hot equipment exhaust air
- Mechanical: Air Handler Systems — The air handler fan is typically the second largest energy use in the mechanical system, and can even exceed the energy use of the cooling plant in some cases. Optimizing the air handler system for datacenter use, as opposed to relying on traditional air handler design rules developed over years of office system design, is essential to achieve an efficient and cost effective system.
- Minimize fan power requirements
- Low pressure drop system design
- Use redundant air handler capacity in normal operation
- Use an optimized airside economizer
- Implement an airside economizer
- Design for medium temperature air
- Control to avoid unnecessary humidity loads
- Use large centralized air handlers
- Minimize fan power requirements
- Mechanical: Humidification — Humidification specifications and systems have often been found to be excessive and/or wasteful in datacenter facilities. A careful, site specific design approach to these energy-intensive systems is usually needed to avoid energy waste.
- Design system to actual equipment requirements
- Use widest suitable humidity control band
- Specify humidity sensor calibration schedule
- Provide appropriate sensor redundancy
- Control humidity with dedicated outdoor air unit
- Eliminate over humidification and/or dehumidification
- Ensure proper economizer lockout
- Maintain coil temperature above 55F
- Centralize humidity control
- Use efficient humidification technology
- Design system to actual equipment requirements
- Mechanical: Plant Optimization — When a chilled water plant is used, all the standard design best practices apply, with a few additions. The unusual nature of a datacenter load, which is mostly independent of outside air temperature and solar loads, makes free cooling very attractive and increases the importance of efficiency over first cost. Also, the typical level of redundancy and reliability can influence the value of various design options.
- Maximize the chiller system efficiency
- Select chiller for high efficiency
- Implement an aggressive condenser water reset
- Minimize tower fan power and size towers for close approach
- Use free cooling / waterside economization
- Use a medium temperature chilled water loop
- Use primary only variable flow chilled water pumping
- Consider thermal storage
- Monitor system efficiency
- Rightsize the cooling plant
- Maximize the chiller system efficiency
- IT Equipment: Selection — The IT equipment is the reason for the facility. Increasingly, there are reasonable opportunities to increase the efficiency of IT equipment, reducing the need for mechanical infrastructure and ongoing energy use directly at the load level through the selection of IT equipment.
- Electrical Infrastructure — Protection from power loss is a common characteristic of datacenter facilities. Such protection comes at a significant first cost price, and also carries a continuous power usage cost that can be reduced through careful design and selection.
- Design UPS system for efficiency
- Maximize unit loading
- Select most efficient UPS possible
- Specify minimum unit efficiency at expected load points
- Evaluate UPS technologies for most efficient
- Do not overspecify power conditioning requirements
- Use self-generation for large installation
- Design UPS system for efficiency
- Lighting — Datacenters are typically lightly occupied. While lighting is a small portion of the total power usage of a datacenter, it can be often be safely reduced through mature, inexpensive technologies and designs.
- Commissioning and Retrocommissioning — An efficient datacenter not only requires a reliable and efficient design, it also requires proper construction and operation of the space. Commissioning is a methodical and thorough process to ensure the systems are installed and operating correctly in all aspects, including efficiency.
- Engage additional design expertise for review and guidance.
- Perform a peer review
- Engage a commissioning agent
- Perform system commissioning
- Document testing of all equipment and control sequences
- Measure equipment energy efficiency onsite
- Provide appropriate budget and scheduling for commissioning
- Perform full operational testing of all equipment
- Perform retrocommissioning
- Perform a full retrocommissioning
- Recalibrate all control sensors
- Where appropriate, install efficiency monitoring equipment
- Engage additional design expertise for review and guidance.